INDUSTRY: Furniture
COUNTRY: Poland

 

SCOPE OF WORK:

  • 20kV Cable installation
  • Delivery and installation of six MV electrical switchgears SM6
  • LV/MV transformer connection between LV and MV electrical switchgears
  • Construction/renovation work in the Switchgear Room
  • Cable installation connecting LV switchgears with the production hall
  • System start-up